Duke Energy Florida
2024 Ten-Year Site Plan
Section 186.801 of the Florida Statutes requires electric generating utilities to submit a Ten-Year Site Plan (TYSP) to the Florida Public Service Commission (FPSC). The TYSP includes historical and projected data pertaining to the utility’s load and resource needs as well as a review of those needs. Duke Energy Florida, LLC’s (DEF) TYSP is compiled in accordance with FPSC Rules 25- 22.070 through 25-22.072, Florida Administrative Code.